Process Crane

Automatic clinker crane in the cement bunker

Application
Video transmission on a Mobile Crane

Operator

Utrans / Kalksteinwerk Wülfrath, Germany

Customer
Utrans / Kalksteinwerk Wülfrath, Germany

Product

Completely pre-assembled system with heavy-duty cable trolley and special round cables for traversing speeds up to 160/60 meters/min.





  • Conductix-Wampfler USA
    Omaha

    10102 F Street
    Omaha, NE 68127
    United States

    Phone: +1 (402) 339-9300
    Fax: +1 (402) 339-9627

    Toll Free: (800) 521-4888

    vCard
    QR-Code
    How to find us