Funicular

Transfer between Airport terminal and train station [cable liner system | DCC]
Transfer between Airport terminal and train station [cable liner system | DCC]
Transfer between Airport terminal and train station [cable liner system | DCC]
Descargas: 

Transfer between Airport terminal and train station [cable liner system | DCC]

Application
Transfer between Airport terminal and train station [cable liner system | DCC]

Country

Great Britain

City

Birmingham

Representative office

Conductix-Wampfler AG [D]

Operator

Doppelmayr [DCC]

Customer
Siemens, Austria

Technical requirement[s]

Electrification of the interior equipment in a People Mover

Product

Conductor Rail, Program 0812 SinglePowerLine

Number of [Load]

2

Travel distance [Load]

2 x 600 m

Travel speed [Load]

36 km/h

Number of poles

3 + PE

Collector assembly

double collector

Current

100 A

Voltage

400 V [AC]

Additional information

  • In operation: 22 hrs./day
  • System capacity: 1.600 people per hour/direction
Relevant Products

Single PowerLine 0812



  • Conductix-Wampfler USA
    Omaha

    10102 F Street
    Omaha, NE 68127
    United States

    Teléfono: +1 (402) 339-9300
    Fax: +1 (402) 339-9627

    Toll Free: (800) 521-4888

    vCard
    Código de respuesta rápida
    Dónde ubicarnos