2 Process-Overhead Cranes in a Nitrogen Fertilizer Warehouse
Reference reportDouble Girder Crane | Bulk Crane | CranesTechnical requirements
Power supply for two Process-Overhead Bulk Cranes
Material handling in a nitrogen fertilizer warehouse requires precision and safety. The two process-overhead cranes (Bulk Cranes) operate with a robust power system: Conductor Rails for main power, Cable Festoons for crane crabs, and Motor-Driven Cable Reels for the bucket. Cellular Buffers at the cranes enhance safety by absorbing energy on end-points of the respective track.
Conductix-Wampfler delivered state-of-the-art energy supply solutions, ensuring optimal performance and long-term reliability.
- Used Products
- Technical Information
- General information
Used Products
Technical Information
Main Power Supply
Product | Conductor rail program 0812 (4 x 400 A) |
---|---|
Track length | 144 m |
Specific features | System incl. insulator and clamping shoe in Stainless Steel V4A finishing |
Power Supply for the Crab
Product | Festoon system, Program 0325 |
---|---|
Track length | 28 m |
Power Supply for the Bucket
Product | 2 Motorized Cable Reels |
---|---|
Cable | 4x16 + 2x(4x1,5C) |
General information
Country | Czech |
---|---|
City | Lovosice |
Operator | LOVOCHEMIE, a.s |