News

ProShell with Conductor Rail System 0812
11/23/2017

Four years ago, SSI Schaefer completely upgraded the central assembly groups for the new generation of storage-retrieval machines (SRMs) and, in doing so, set new standards in performance, flexibility, and efficiency. An important component of the Exyz SRM is the efficient energy supply delivered by the 0812 conductor rail system combined with ProShell from Conductix-Wampfler.

BridgeGuard Pro
11/06/2017

BridgeGuard provides crane builders with advanced distance sensing technology to avoid crane-to-crane or crane to end collisions. Three models are available, all with adjustable brackets

VersaReel - the commercial grade cable reel
10/17/2017

VersaReel is Conductix-Wampfler’s answer for commercial duty cable reel Applications. This brand new reel is an economical, reliable, and efficient cable reel that can provide remote power for many commercial applications.

Conductix-Wampfler’s LASSTEC Container Weighing System Earns OIML R51 Certification
10/11/2017

Earlier in 2017 Conductix-Wampfler’s LASSTEC Container Weighing System attained the OIML R51 certification. Further guarantee for continuous success in ports around the world.

PowerGuard - Electrification Isolation System
09/13/2017

Conductix-Wampfler’s PowerGuard™ system is engineered for multi-crane runways to provide a safe zone for servicing cranes without shutting down the entire runway.

Hans Künz GmbH and Conductix-Wampfler have signed a contract for motor driven cable reels for 32 ASCs at the Conductix-Wampfler booth at TOC Europe in Amsterdam (from L to R: Johannes Moser, Head of Purchasing & Transport Logistics, Hans Künz GmbH; Christ
07/14/2017

New motor driven cable reel generation SMART drive for supplying 32 automatic stacking cranes for Hans Künz GmbH at APM Terminals Tangier

Crane_Bridge_Electrification-v1.jpg
05/31/2017

QuickBridgeTM is a new concept in bridge electrification to give your overhead cranes a clean, contemporary look.

World’s Largest Offshore Overhead Gantry Crane
05/09/2017

Conductix-Wampfler has delivered the power supply units for the world’s largest offshore overhead gantry crane. The special crane is being used in the construction of a new road around the island Réunion

Pages